What are the installation methods for the grid? What range is applicable?
Time:2019/4/1 14:57:09      Click:1491

There are many ways to install the grid. The most common methods and the applicable scope are as follows:

1. High-altitude bulk method. The high-altitude bulk method is divided into a full-support method, a partial movable bracket method and a cantilever method. This method is suitable for large-scale assembly of brackets in difficult lifting situations. When installing the grid using this method, pay attention to the position of the elevation and the axis to determine a reasonable assembly sequence.

2. Striping or block grid installation method. The welding and assembling work of the grid installed by this method must be completed on the ground, and the equipment cost of the crane is reduced by using the equipment of the construction site, which greatly saves the cost.

3. High-altitude slip method. To use this grid installation method, first divide the grid into strips of grid units, and set the rails in advance to slide the grid to a pre-designed location. This grid mounting method is suitable for applications that span engineering and require three-dimensional cross-over construction.

4. The overall lifting method. This method requires a method of lifting the grid to a fixed position after the grid is installed on the ground. This method is suitable for grid structures that are within the range that lifting equipment is allowed to withstand. Pay attention to the control of the synchronous rise of the grid during the implementation process.

5. The overall promotion method. This method requires a truss structure with a large number of peripheral supports. It is required to install a truss lifting device on the structural column to raise the truss installed on the ground to a desired position.

6, the overall jacking method. This method requires the method of splicing the grid into a whole on the ground and then lifting the grid to the design height with a jack. This method is suitable for point support grids, and requires a good control of the verticality control of the grid.


Prev:Selection of steel structure of gymnasium grid
Next:Steel grid processing, installation and inspection

go back

RELATED NEWS

Guess you're interested...

主站蜘蛛池模板: 99国产超薄丝袜足j在线观看| 亚洲国产日韩综合久久精品| 香蕉av一区| 少妇高清精品毛片在线视频| 国产日韩欧美91| 国产一区亚洲一区| 另类视频一区二区| 亚洲区在线| 国产一区在线视频播放| 在线精品国产一区二区三区88 | 日本午夜一区二区| 日韩精品一区在线视频| 久久99精品久久久野外直播内容| 一区二区三区毛片| 国产精品视频二区不卡| 精品999久久久| 日韩精品久久久久久中文字幕8| 激情久久一区二区| 午夜爽爽视频| 精品亚洲午夜久久久久91| 久久综合国产精品| 午夜片在线| 一区二区三区毛片| 国产美女视频一区二区三区| 精品香蕉一区二区三区| 午夜电影三级| 夜夜精品视频一区二区| 午夜av资源| aaaaa国产欧美一区二区| 久久久中精品2020中文| 97涩国一产精品久久久久久久| 99久久久国产精品免费无卡顿| 免费精品一区二区三区第35 | 日本伦精品一区二区三区免费| 久久夜靖品2区| 国产精品国产三级国产专区53| 玖玖玖国产精品| 欧美一区视频观看| 国产精品久久免费视频在线| 日韩欧美激情| 欧美777精品久久久久网| 久精品国产| 精品久久久久一区二区| 久久不卡一区| 99精品视频一区二区| 国产一级二级在线| 黄色av中文字幕| 狠狠色噜噜狠狠狠狠2021免费| 99久久精品国产国产毛片小说| 国产区二区| 精品久久久久久久免费看女人毛片| 欧美激情视频一区二区三区免费 | 免费久久一级欧美特大黄| 国内精品99| 国产色婷婷精品综合在线播放| 午夜免费一级片| 国产在线精品一区二区| 日韩精品少妇一区二区在线看| 欧美一区二区色| 国产精品电影一区| 欧美一区二区性放荡片| 国产经典一区二区| 国产香蕉97碰碰久久人人| 国产www亚洲а∨天堂| 在线国产精品一区| 国产欧美日韩亚洲另类第一第二页| 色综合久久久久久久粉嫩| 日本高清二区| 日本一区二区免费电影| 国产三级精品在线观看| 欧美一区二区三区在线免费观看 | 伊人av中文av狼人av| 精品一区二区三区影院| 蜜臀久久精品久久久用户群体| 亚洲v欧美v另类v综合v日韩v| 国产97在线播放| 鲁丝一区二区三区免费| 国产精品久久久久久亚洲美女高潮| 国产视频一区二区三区四区| 久久99精品久久久久国产越南 | 国产经典一区二区| 国产一级片子|