What construction problems should be paid attention to in the winter of steel structure engineering?
Time:2019/4/1 14:45:03      Click:1538

Winter construction measures for steel structure engineering:

1. Steel structure fabrication and installation Winter construction is strictly carried out in accordance with the winter construction regulations for steel structures.

2. When the steel components are installed above or below zero degrees Celsius, the shrinkage of the components should be considered according to the difference in ambient temperature, and measures to adjust the deviation should be taken during construction.

3. Electric welders who participate in the construction of steel structures below zero degrees Celsius should be trained in the negative temperature welding process and have the corresponding certificate of operation.

4. The steel and related connecting materials used under negative temperature shall be accompanied by a quality certificate, and the performance shall meet the requirements of the design and product specification standards.

5. The electrode used below zero degrees Celsius shall not exceed 2 hours, re-bake for more than 2 hours, and the number of baking of the electrode shall not exceed 3 times.

6. The flux is baked as specified before use, so that the water content does not exceed 0.1%.

7. High-strength bolts used below zero degrees Celsius must have a product certificate and re-test the torque factor and axial force at negative temperature.

8. Water-based paints shall not be used for coatings used in steel structures below zero degrees Celsius.

9. When the component is cut, the shrinkage allowance should be reserved. The amount of weld shrinkage and compressive deformation should be coordinated with the shrinkage deformation of the steel below zero degrees Celsius.

10. When assembling the components, expand the group from the inside to the outside in the order specified by the process, and test the negative temperature group to determine the shrinkage value of the weld to be reserved.

11. When assembling the components, remove the rust, burrs, dirt, oil, ice and snow from the seams of 50mm, and keep the joints dry without residual moisture.

12. Below zero degrees Celsius For welding of steel plates above 9mm, multi-layer welding shall be used. The welds shall be welded from bottom to top, and each weld shall be welded once. If the welding is interrupted, the welding defects shall be removed before re-welding. It is strictly forbidden to lead the arc on the welding base metal.

13. When the steel structure is installed on site, if it is snowy or the wind speed is above 6m/s, set up a protective shed.

14. Unqualified welds are removed from re-welding and welded in accordance with the welding procedure for steel structures at negative temperatures.

15. When the ambient temperature is lower than 0 °C, the coating process test should be carried out before applying the anti-corrosion coating. When painting, the rust, oil stain, burr and other materials on the surface of the component must be cleaned and the surface should be kept dry. Do not perform painting work on snowy days or when there is thin ice on the components.

16. In the winter, when the steel structure is piled up, anti-slip measures are taken, and the piled up parts are flat and solid without water, and there is no ice on the ground. When stacking the same type of components, the components should be level and the horns placed on the same vertical line to prevent the components from slipping.

17. Before the installation of the steel structure, according to the requirements under the condition of negative temperature, the quality of the steel structure shall be re-inspected, and the components that are deformed during the production inspection and transport stacking shall be repaired and corrected on the ground.

18. According to the temperature conditions, prepare the steel component installation sequence chart, and install it strictly in the prescribed order.

19. According to the temperature conditions, prepare the steel component installation sequence chart, and install it strictly in the prescribed order.

20. Prepare the steel structure installation welding process, one end of one component shall not be welded at the same time.

21. Remove ice, snow, and dew on the surface of the component before installation, but do not damage the coating.

22. The column and main beam installed at negative temperature are immediately corrected. The position correction is correct and immediately fixed permanently. The components installed on the same day should form a stable space system.

23. When the high-strength bolt joint is installed, the friction surface of the component shall not have snow and ice, and shall not touch the dirt, oil and other pollutants.

24. The installation quality of the steel structure under negative temperature shall be inspected and accepted according to the design requirements, in addition to the requirements of the “Code for Construction and Acceptance of Steel Structure Engineering”.


Prev:Grid steel structure residential market
Next:How is the load of the grid steel structure calculated?

go back

RELATED NEWS

Guess you're interested...

主站蜘蛛池模板: 97久久精品人人做人人爽50路| 精品国精品国产自在久不卡| 日韩一级片免费观看| 国产精品一区二区在线观看| 性生交片免费看片| 久久96国产精品久久99软件| 国产精品视频1区| 夜夜嗨av色一区二区不卡| 欧美国产精品久久| 国产区一区| 96国产精品| 国产欧美精品久久| 99国产精品| 国产精品一二三区视频网站| 午夜三级大片| 午夜av电影网| 日韩av在线影视| 国产欧美日韩在线观看| 日本三级韩国三级国产三级| 亚洲四区在线| 国产在线一区不卡| 欧美一区免费| 精品国产一区二区在线 | 制服丝袜二区| sb少妇高潮二区久久久久| 欧美一区二区激情三区| 亚洲欧美另类久久久精品2019| 精品国产九九九| 国产精品日韩高清伦字幕搜索| 三级电影中文| 首页亚洲欧美制服丝腿| 国产日韩一区二区在线| 国产精品日韩一区二区| 中文字幕日本一区二区| 亚洲午夜精品一区二区三区电影院 | 日韩精品免费看| 久久国产激情视频| 国产欧美一区二区三区免费| 狠狠色丁香久久综合频道| 欧洲精品一区二区三区久久| 亚洲码在线| 国产在线一区观看| 午夜一级免费电影| 亚洲无人区码一码二码三码| 欧美日韩亚洲另类| 国产精品一区二区免费| 久久精品男人的天堂| 国内少妇偷人精品视频免费| 久久婷婷国产麻豆91天堂徐州| 日韩一区高清| ass美女的沟沟pics| 午夜一区二区三区在线观看| 国产精品美女久久久免费| 少妇自拍一区| 午夜av影视| 日本福利一区二区| 国产欧美性| 粉嫩久久99精品久久久久久夜| 日本三级不卡视频| 亚洲欧美日韩综合在线| 欧美一级日韩一级| 国产激情视频一区二区| 一区二区在线视频免费观看| 狠狠色噜噜狠狠狠色综合| 国产区精品| 91精品一二区| 99国产精品一区二区| 国产在线不卡一| 久久国产欧美一区二区三区免费| 国产一区=区| 亚洲精品一区,精品二区| 久久99精品久久久大学生| 国产视频精品久久| 久久综合激情网| 精品少妇一区二区三区免费观看焕| 99国产精品| 亚洲国产另类久久久精品性| 国产精品v欧美精品v日韩| 九色国产精品入口| 狠狠躁夜夜躁2020| 夜夜爱av| 久久国产这里只有精品|